# 🔄 Mandatory Flexi-CR for EDGE

## **What is the EDGE Roll-out?**&#x20;

The EDGE (Enterprise Development and Growth for Enterprises) grant is a new consolidated business grant from Enterprise Singapore, launching in H2 2026, which merges the EDG, PSG, and MRA grants into a single application process. In preparation for EDGE, all pre-approved solutions must adopt a **Flexible Packages (Flexi)** structure which involves two mandatory changes:

* **Variable Cost Items (VCI)** — configurable, add-on cost components attached to a base package
* **Standardised Unit of Measurement (UOM)** — replacing free-text UOM fields with a pre-defined list

Once your packages are approved, they will be made available via the Package Builder on the SMEs Go Digital Platform, where BGP applicants can select and construct a package that suits their needs, along with any applicable Variable Cost Items required for their project implementation.

For example, if your Package 1 is designed for 10 users, 2 man-days for setup, and 1 day of training, a BGP applicant could use the Package Builder to procure the base package and add on additional Variable Cost Items such as extra licences or additional man-days of professional services for data migration as required for their specific project implementation.

***

**What must vendors do?**

All vendors must submit a Change Request (Flexi-CR) per approved solution to migrate the existing solution packages to Flexi structure. This process will be activated progressively by solution category, starting from **April 2026**. EDGE is targeted to go live from **October 2026 onwards**.

***

**What this means for you?**

New Applicants

* Applications submitted from **April 2026** onwards that are on track to receive a Letter of Appointment (LOA) *before* the Flexi Activation Date will be listed on BGP first, and subsequently on EDGE.
* Applications that are *not* on track for LOA issuance before the Flexi Activation Date will require an update in Pricing and Packages section to include Flexi before resubmission. Such solutions will be listed on EDGE when it goes live (**October 2026 onwards**).

Existing Vendor who has no ongoing change request&#x20;

* You are required to review your solution packages and submit a Flexi-CR for *each* pre-approved solution.
* This applies even if you do not intend to change your package configuration — at minimum, your packages must adopt a standardised UOM.
* Vendors will be contacted with their scheduled Flexi-CR submission dates, based on solution category.

Existing Vendor who has an ongoing change request&#x20;

* If you have an existing CR (e.g. for pricing or naming changes) that is still in progress after the Flexi Activation Date, you must incorporate Flexi changes (VCI and standardised UOM) into that change request before resubmission for evaluation.

{% hint style="info" %}
All Flexi-CR changes will take effect upon the launch of EDGE in October 2026. Change Requests submitted after the deadline will not be processed until after EDGE has launched. Please refer to the table below for respective deadlines. &#x20;
{% endhint %}

**Learn how to submit a** [**Change Request** ](/maintaining-your-contract-status/how-to-keep-my-status-as-a-pre-approved-vendor/change-request-process/mandatory-flexi-cr-for-edge/how-to-submit-a-flexi-cr.md)**to update to the Flexi structure**

***

**When will this take place?**

The switch to Flexi will be activated progressively, by solution categories, starting from April 2026:

<table><thead><tr><th width="329.4698486328125">Solution Categories</th><th>Flexi-CR Submission Start (Flexi Activation Date)</th><th>Deadline for Flexi-CR Submission</th><th>Flexi-CR Briefing Slides</th></tr></thead><tbody><tr><td>Document Management and Mobile Access System</td><td>14th April 2026</td><td>22nd April 2026</td><td><a href="https://go.gov.sg/flexicrdms">https://go.gov.sg/flexicrdms</a></td></tr><tr><td><p>HR Solutions, i.e.: </p><ul><li>Employee Reward &#x26; Recognition System;  </li><li>HR E-scheduling System;  </li><li>HRMS </li><li>HRSS Needs Analysis + HR Admin  </li></ul></td><td>11th May 2026</td><td>22nd May 2026</td><td><a href="https://go.gov.sg/flexicrhrms">https://go.gov.sg/flexicrhrms</a></td></tr><tr><td>Digital Marketing Packages, E-Commerce – Online Shop (B2C)</td><td>25th May 2026</td><td>12th June 2026</td><td>TBC</td></tr><tr><td><p>Generic 1:  </p><ul><li>Accounting Management and Sales Management; and </li><li>Accounting Management, Inventory Management and Sales Management  </li></ul></td><td>TBC</td><td>TBC</td><td>TBC</td></tr><tr><td>Generic 2: Cyber Security-related</td><td>TBC</td><td>TBC</td><td>TBC</td></tr><tr><td>Generic 3: Others under Generic</td><td>TBC</td><td>TBC</td><td>TBC</td></tr><tr><td>Sector-specific for Food Services, Logistics, Personal Care Services, Precision Engineering, Retail, Wholesale Trade</td><td>TBC</td><td>TBC</td><td>TBC</td></tr></tbody></table>


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://preapproval-guide.imda.gov.sg/maintaining-your-contract-status/how-to-keep-my-status-as-a-pre-approved-vendor/change-request-process/mandatory-flexi-cr-for-edge.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
